Home

puresafety menu logo

English Spanish
Quote Cart

GR6 GR11

big PSG BaxterArticle Website RectangularAd APR 2019

large GFP Series5 WebBannerAd APR 2019 01

OnlineTrainingButtonRevC

ESG provided Sound Transit with a horizontal lifeline system composed of 100% 316 Stainless Steel components, swaged cable ends, and anchors with engraved product numbers.

Our design engineers ensured product and material compatibility by providing tin-plated copper oval sleeves for the 3/8” stainless steel cable lengths. This softer material allowed for the oval sleeves to be installed in the field while retaining the weather resistant properties that Sound Transit required for this system.

The system was reviewed by Nathan Louws, a Guardian ESG design representative, after installation was completed. The installation was performed by JEM Contractors accomplished with precise regards to the detail shown in the shop drawings (also provided by ESG).

ESG’s ability to meet specification requirements, flexibility to fabricate custom design solutions, and consistent communication with JEM installers, all contributed to implement this first-rate fall protection system.

LOCATION

Seattle, WA

System Designer

ESG Lead Design Engineer, Nathan Louws - This email address is being protected from spambots. You need JavaScript enabled to view it.

System Installers

JEM Contractors